2015, EGS, Lincs, Hydrographic, Geophysical and Benthic Survey

2015, EGS, Lincs, Hydrographic, Geophysical and Benthic Survey

Summary

EGS International Ltd (EGSi) were contracted by Centrica Renewable Energy Limited (CREL) to undertake the 2015 post construction (Year 3) hydrographic and geophysical surveys of the Lincs and L and ID (Lynn and Inner Dowsing) windfarm array cable routes. Additionally, a benthic survey was required for the Lincs OWF post construction survey. This series details the operations and results of the surveys.
Categories
Geophysical
Development
Lincs
Industry
Wind
Phase
Post-construction
Organisation
EGS
Available in this series
3 Datasets, 4 Reports

Data & downloads

Datasets