
2015, EGS, Lincs, Hydrographic, Geophysical and Benthic Survey
Summary
EGS International Ltd (EGSi) were contracted by Centrica Renewable Energy Limited (CREL) to undertake the 2015 post construction (Year 3) hydrographic and geophysical surveys of the Lincs and L and ID (Lynn and Inner Dowsing) windfarm array cable routes. Additionally, a benthic survey was required for the Lincs OWF post construction survey. This series details the operations and results of the surveys.
Data & downloads
Datasets
