2013, Osiris Projects, Lincs, Geophysical Survey (Winter)

2013, Osiris Projects, Lincs, Geophysical Survey (Winter)

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

April 2013 - May 2013

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Osiris Projects were commissioned in April 2013 by Centrica Renewable Energy Ltd.
(CREL) and Renewable Energy Systems Ltd. (RES) to carry out post-construction
surveys on the LINCS Offshore Wind Farm (OWF) and associated export cable route.

The survey was completed under LOGIC Terms and Conditions. The survey works
conducted by MV Chartwell were c...

Categories:
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'