2011, ABPmer, Lincs, Review of Cable Installation Process - Jetting Option

2011, ABPmer, Lincs, Review of Cable Installation Process - Jetting Option

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

January 2011 - January 2011

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Centrica commisioned ABPMer to prepare thsi in response to specific consent conditions in the Lincs FEPA licence (Licence 33574/10/1) which requires the Licence Holder to submit details of predicted re-suspended sediment plumes in the case that jetting methods are requested as the most feasible option for burial of the export cable across the inter...

Categories:
Intertidal Ecology
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Reports
1