2011, EGS, Lincs, Collector and Array Cables

2011, EGS, Lincs, Collector and Array Cables

Summary

The Lincs OWF Project involves the development of an offshore wind farm off the coast of Skegness (Lincolnshire) by Centrica Renewable Energy. Preconstruction bathymetric and geophysical survey data was required along the LINCS array cable and collector cable routes. Survey lines were divided into 2 categories: Collector Cables, connecting circuits with the substation, and Array Cables, connecting turbines within the circuits. In total the Collector and Array Cables constitute 77 Centreline segments, as presented in Appendix E: Collector & Array Cable Layout. Multi Beam Echo Sounder (MBES), Side-Scan Sonar (SSS) and Sub-Bottom Profiler (SBP) data will be acquired to determine seabed features, morphology, bathymetric and shallow geology along the proposed cable routes.
Categories
Geophysical
Development
Lincs
Industry
Wind
Phase
Pre-construction
Organisation
EGS (International) Ltd
Available in this series
3 Datasets, 3 Reports

Data & downloads

Datasets