
2017, EGS, Lincs Offshore Wind Farm, Lincs LS23 and LS65 Clearance Survey
Summary
EGS International Ltd (EGSi), were contracted by Centrica Renewable Energy Limited (CREL) to undertake a side scan sonar (SSS) and multibeam (MBES) clearance survey centred on the no cable zone (400m x 400m) adjacent to WTGs LS23 & LS65 at the Lincs Offshore Wind Farm. The surveys were required to support the safe emplacement of a jack-up vessel adjacent to the WTG for maintenance purposes. This series details the operations and results of the survey around all turbines.
Data & downloads
Datasets
