2004-2005, HydroSoil, Gardline Geosciences & Osiris Projects, London Array, Ground Investigation Survey

2004-2005, HydroSoil, Gardline Geosciences & Osiris Projects, London Array, Ground Investigation Survey

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

September 2026

Collection date:

March 2004 - March 2005

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2022

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

London Array Limited commissioned geophysical and geotechnical surveys for the proposed offshore wind farm in the outer Thames Estuary, comprising up to 300 turbines and a 46.5km buried electrical cable connection. Conducted by Osiris Projects and Gardline Geosciences, with oversight by Hydro Soil Services, the surveys employed sonar, vibrocores, C...

Categories:
Geotechnical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Reports
5

Deep dive in the data

Choose what you wish to look into:

Dataset

|

Report

|

Other

Final Factual Report Part 1

Final Factual Report Part 2

Geotechnical (Factual) Report

Interpretative Report

Revised Final September 2005 Interpretative Report

Select a Package from the list on the left to see more information about it