Summary
Osiris Projects were commissioned by Shell U.K. Limited to carry out a detail survey at the near shore wind farm development site known as the London Array project, together with associated cable route surveys. The surveys were carried out during the period 28th April to 6th August 2004, with substantial delays due to adverse weather conditions. ...