Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2015, PLA Hydrographic Service, Gunfleet Sands 3, Export Cable and WTG Inspection Surveys (Summer 2015)

2015, PLA Hydrographic Service, Gunfleet Sands 3, Export Cable and WTG Inspection Surveys (Summer 2015)

Topic categories:

Geophysical

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Jun 2015 - Jun 2015

Development:

Gunfleet Sands 3

Publication date:

May 2021

Round:

Demo

Organisation:

PLA Hydrographic Service

Phase:

Post-construction

Description

The Port of London Authority (PLA) Hydrographic Service was commissioned by DONG
Energy to undertake a Multibeam Echosounder (MBES) survey at the Gunfleet Sands 3
Offshore Windfarm in the Thames Estuary.

The scope of work, for the June 2015 survey included:
1. MBES survey of 50m wide corridor along Export Cable Route between the
WTG F0 and the HDD...