2019-2020, Geoquip, Moray West Offshore Windfarm, Deep Geotechnical Site Investigation

2019-2020, Geoquip, Moray West Offshore Windfarm, Deep Geotechnical Site Investigation

Summary

Geoquip Marine were contracted by Moray Offshore Windfarm (West) Limited to perform a geotechnical investigation at various locations across the site for the future installation of 98 turbines and 2 offshore substations. The scope of work included 48 alternating downhole sampling / Seismic Cone Penetration Tests (SCPTU) and 52 continuous seabed SPCTU to a target depth of 25m to identify in situ soil conditions. The downhole drilling began on the 29 May 2019 and ended on 18 September 2019. The seabed (S)CPTU began on the 14 December 2019 and ended on 19 January 2020. Operations were conducted using the GMR600 drilling rig and GMCPT201 seabed CPTU system, conducted by MV Geoquip Saentis.
Categories
Geotechnical
Development
Moray West
Industry
Wind
Phase
Pre-Consent
Organisation
Geoquip
License
Marine Data Exchange Terms of Use

Data & downloads

Datasets

Data Highlights