Summary

Moray West contracted Fugro GB Marine Limited to provide soils information by carrying out a geotechnical site investigation. The investigation was split into two phases. Phase 1 involved downhole cone penetration testing and seismic velocity testing from the MV Normand Flower from 25/01/2021 to 03/03/2021. Phase 2 involved further testing from the Fugro Scout, carried out at additional locations from 02/09/2021 to 12/09/2021.