2014, Fugro GeoConsulting, Hywind Offshore Wind Farm, Geotechnical Investigations

2014, Fugro GeoConsulting, Hywind Offshore Wind Farm, Geotechnical Investigations

Summary

The ST14460 geotechnical soil investigations provides information for anchoring of five floating wind turbines, and on the soil conditions along the export cable route from the wind farm area to Peterhead. The offshore activities were carried out from the DP II vessel 'Toisa Voyager' between 2014-03-28 and 2014-04-03. The operations were conducted on a continual 24-hour basis. At the planned Wind Farm site a total of 15 deep push seabed CPTUs were carried out to maximum possible penetration or planned target depth. Along the preliminary cable route a total of 19 shallow seabed CPTUs and 2 additional tests (re-runs) were performed. The onshore laboratory work was contracted out to the Danish Geotechnical Institute (GEO) and the Norwegian Geotechnical Institute (NGI). Tests on soil samples included grain size, plasticity, thermal conductivity and electrical resistivity.
Categories
Geotechnical
Development
Hywind
Industry
Wind
Phase
Pre-construction
Organisation
Fugro GeoConsulting
License
Marine Data Exchange Terms of Use

Data & downloads

Datasets

Data Highlights