2013, Xodus Group, Hywind Offshore Wind Farm, Landfall Site Walkover - Geotechnical Evaluation

2013, Xodus Group, Hywind Offshore Wind Farm, Landfall Site Walkover - Geotechnical Evaluation

Powered by: CES
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2026

Collection date:

July 2013 - July 2013

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

September 2025

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Summary

Statoil are planning to develop an offshore wind farm Pilot Park approximately 25 km to the east of Peterhead on the Aberdeenshire coast covering an area of approximately 60 km2. The Pilot Park will be located either to the north or south of the BP Forties C to Cruden Bay Pipeline, which runs through an Exclusivity Area associated with the developm...

Categories:
Geotechnical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Data Highlights
1
Reports
1

Deep dive in the data

Choose what you wish to look into:

Dataset

|

Report

|

Other

Report

Select a Package from the list on the left to see more information about it