2005, Young Associates, Ormonde, Onshore Ecological Studies

2005, Young Associates, Ormonde, Onshore Ecological Studies

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

May 2005 - May 2005

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

This series contains an ecological report for the terrestrial section of a buried electricity cable route linking the Ormonde Cogeneration Project with the National Grid sub-station at Heysham.  In addition there are the results of an intertidal sabellaria spinulosa survey.

Categories:
Onshore
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Data Highlights
1
Reports
2

Data Highlights


Explore the wealth of the data gathered in the 2005, Young Associates, Ormonde, Onshore Ecological Studies


3

An Ecological Impact Assessment of the Ormonde Cogeneration Project