2008, HR Wallingford, Ormonde, Scour Assessment

2008, HR Wallingford, Ormonde, Scour Assessment

Summary

Previously a coastal and seabed process study was completed including an assessment of seabed scouring around a 5m diameter monopile foundation (HR Wallingford, 2005). An alternative foundation solution has been proposed for the project comprising of quadrupod steel jacket structures. This document contains a new assessment of seabed scouring for this alternative foundation. Global scour could be between 0.3D – 1.3D for a series of piles, which would give an estimate of global scour of between 0.5m – 2.0m. It is considered that given the influence of the cross-members, global scour is likely to be at the lower end of the estimate, that is, 0.5m. The maximum extent of this is likely to be of the order of twice the width of the whole structure, that is, 40m. Therefore, the maximum total scour depth for the structure as a whole is likely to be of the order of 2.8m, or 1.84D.
Categories
Coastal Processes
Development
Ormonde
Industry
Wind
Phase
Pre-construction
Organisation
HR Wallingford
Available in this series
1 Report

Data & downloads

Reports