2008, NPower Renewables Ltd., Rhyl Flats Offshore Wind Farm, Project Environmental Management Plan Version 2.2

2008, NPower Renewables Ltd., Rhyl Flats Offshore Wind Farm, Project Environmental Management Plan Version 2.2

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

January 2007 - December 2008

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

The purpose of the PEMP is to ensure that the construction of the offshore elements of the Rhyl Flats
Offshore Wind Farm meets the requirements established by legislation, legal consents and
environmental commitments, and that it follows environmental best practice. It contains nine parts: 
1. RFOWFL Project Environmental Management Plan
2. RFOWFL ...

Categories:
Other
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Reports
1