2012, EGS, Burbo Bank, Bathymetric Survey

2012, EGS, Burbo Bank, Bathymetric Survey

Summary

DONG Energy contracted EGS (International) Ltd to undertake a bathymetric survey in the post-construction (operational) phase of the project using both Multibeam Echo Sounder (MBES) and Side Scan Sonar (SSS) survey techniques. The primary objective of the survey was to assess the stability of the scour protection around the turbine foundations. To meet the requirements of the survey, survey lines were run at a distance of 25 metres either side of a centreline which connected the turbine locations.
Categories
Geophysical
Development
Burbo Bank
Industry
Wind
Phase
Post-construction
Organisation
EGS (International) Ltd
License
Marine Data Exchange Terms of Use