Summary
The report in this series provides the results of the multibeam echo sounder survey of Scroby Sands offshore wind farm. The survey was undertaken between the 19th and 22nd of May 2015. The scope of the work included the 30 x wind turbine generators plus 20m; a corridor of 10m either side of the cables connecting the wind turbines; and the three exp...