2015, Projects46, Scroby Sands, Multibeam Echo Sounder Survey

2015, Projects46, Scroby Sands, Multibeam Echo Sounder Survey

Summary

The report in this series provides the results of the multibeam echo sounder survey of Scroby Sands offshore wind farm. The survey was undertaken between the 19th and 22nd of May 2015. The scope of the work included the 30 x wind turbine generators plus 20m; a corridor of 10m either side of the cables connecting the wind turbines; and the three export cables with a 10m corridor either side and into shore as far as sea depth allowed.
Categories
Geophysical
Development
Scroby Sands
Industry
Wind
Phase
Post-construction
Organisation
Projects46
License
Marine Data Exchange Terms of Use

Data & downloads

Datasets