2008, Harrison Geotechnical Engineering, Sheringham Shoal, Substation Site Investigation

2008, Harrison Geotechnical Engineering, Sheringham Shoal, Substation Site Investigation

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

July 2008 - July 2008

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

The work covered by this report was undertaken for Scira Offshore Technology Limited working on behalf of StatoilHydro ASA. The purpose of this report was to provide information on the ground conditions beneath the site in order to assess the suitability for development of a proposed substation adjacent to the existing electricity substation. The n...

Categories:
Geotechnical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Reports
1