Summary

Fugro was commissioned by Equinor (U.K), to undertake monitoring surveys of the Sheringham Shoal Offshore Wind Farm, export cable route, and transit route. The report in this series provides a comparison of the results from five surveys carried out by Fugro; the 2008 pre-installation survey, winter 2013, winter 2014, winter 2015 and winter 2018 monitoring surveys. The 2008 survey was a full pre-construction geophysical and hydrographic survey and provided a baseline for an assessment of changes that may have resulted from the construction of the Wind Farm infrastructure. The 2013, 2014, 2015 surveys were carried out in order to meet the requirements for site monitoring as set out in MMO Licence L/2011/00153/16. The 2018 survey was undertaken as part of an ongoing program of preventative maintenance.
Categories
Geophysical
Development
Sheringham Shoal
Industry
Wind
Phase
Post-construction
Organisation
Fugro
Available in this series
1 Report

Data & downloads

Reports