2012, Fugro EMU, Sheringham Shoal, Marine Survey

2012, Fugro EMU, Sheringham Shoal, Marine Survey

Summary

Fugro EMU Limited (Fugro EMU) was commissioned by Scira Offshore Energy Limited to conduct a bathymetry and sidescan sonar survey of the Sheringham Shoal Offshore Wind Farm, a prescribed transit route and cable export corridor. The survey was required to fulfil Marine Management Organisation (MMO) requirements for post-construction monitoring of scour, trenched cables and debris. In order to meet these requirements, the scope of work required that Fugro EMU provide the following deliverables and reports: - Accurate bathymetry across the Wind Farm and along the export corridors - High resolution sidescan sonar across the entire survey area - An archaeological assessment by subcontractor, Wessex Archaeology The survey was undertaken between 1st November 2013 and 3rd December 2013 on board RV Discovery, all survey objectives and contractual requirements were achieved.
Categories
Geophysical
Development
Sheringham Shoal
Industry
Wind
Phase
Post-construction
Organisation
Fugro EMU
Available in this series
4 Datasets, 2 Reports

Data & downloads

Datasets