2014, Titan, Walney, Export Cable Route Infill Survey
Summary
Data & downloads
Datasets
Related Pages
Series2017, Bibby Hydromap, Walney, Asset Integrity Survey 3
Bibby HydroMap were commissioned in May 2017 by DONG Energy to carry out surveys for the crossing and proximity agreement on the WOW0102 wind farm. The surveys were completed under Bibby HydroMap’s Terms and Conditions. The surveys were carried out between 11/05/17 and 19/05/17. The main objectives were as follows: - Minimum 100% coverage - Sounding density better than 40 hits/m2 - Freespan detection >0.2m - Detect any debris of size larger than 0.5m in any dimension (width, length or height) on the seabed Data acquisition was undertaken from Bibby HydroMap’s own vessel MV Lia This dataset comprises information describing the bathymetry in the survey areas.
Series2016, Deep BV, Walney, Export Cable Geophysical Depth of Burial Survey
DONG Energy awarded Deep BV with the contract for the execution of the Depth of Burial & Geophysical Survey on the export cables of the Walney 01 + 02; Barrow Offshore Wind Farms. The export cable routes are located in the East Irish Sea with landfalls on the west coast of England. The primary objectives of the Depth of Burial; Geophysical surveys to be undertaken within the scope of this specification include as a minimum: Acquire depth of burial of the cable over the entire accessible part of the export cables (the survey footprint includes both offshore and near shore areas) using the cable tracking system; Acquire accurate geographical position of cable along with Kilometer Post (KP) positioning along the route; Verify DoB cable tracker data with sub-bottom profiler data. Obtain Sub bottom data at locations where no DoB data can be measured when using the DOBstar equipment; Obtain multibeam data along the export cable routes in a corridor of at least 10 m on each side of cable. For very shallow areas this corridor can be narrowed Obtain side scan sonar data along the export cable routes Monitor changes in bathymetry compared to previous surveys Classify targets on the seabed, including exposed cables, free spans and rock dumping areas. This series contains data for the Walney 1 and 2 export cables only.
Series2016, Fugro EMU Limited, Walney, Post Construction Survey Export Cables
Fugro EMU Limited (Fugro EMU) was contracted by DONG Energy (hereafter known as the client) to undertake two separate bathymetric surveys (survey 1 and survey 2) in the East Irish Sea, which were performed as one combined survey operation during spring 2016. This report provides information relation to survey 1 on the Walney Offshore Windfarm (WOW) 01 and 02. Survey 2 was carried out on the adjacent West of Duddon Sands Offshore Windfarm and has been reported on separately. The purpose of survey 1 was to provide detailed information on the current state of the offshore installations, inter array and export cables on WOW 01 and WOW 02, in order to fullfill the requirements of the MMO’s license conditions for a post construction survey in 2016.
Series2016, Fugro Emu Limited, Walney, Post Construction Survey 1
Fugro EMU Limited (Fugro EMU) was contracted by DONG Energy (hereafter known as the client) to undertake two separate bathymetric surveys (survey 1 and survey 2) in the East Irish Sea, which were performed as one combined survey operation during spring 2016. This report provides information relation to survey 1 on the Walney Offshore Windfarm (WOW) 01 and 02. Survey 2 was carried out on the adjacent West of Duddon Sands Offshore Windfarm and has been reported on separately. The purpose of survey 1 was to provide detailed information on the current state of the offshore installations, inter array and export cables on WOW 01 and WOW 02, in order to fullfill the requirements of the MMO’s license conditions for a post construction survey in 2016. Survey 1 covered a selection of 7 wind turbine generators (WTGs), 11 km of array cables between the selected WTG’s, the WOW01 offshore substation, as well as the entire export cable routes. The offshore geophysical survey area was carried out by the RV Discovery. The nearshore geophysical survey area was surveyed by the vessel Valkyrie.
Series2015-2016, DONG Energy, Walney, Wave Radars
In March 2015 Fugro EMU (Fugro) installed 3 wave radars across the Walney Offshore Windfarms (Walney 1 and Walney 2) for Dong Energy (DE). The type of instrument installed was a Rosemount WaveRadar REX instrument.
Series2014, EGS, Walney, Geophysical Survey
In September 2014 EGS (International) Ltd was contracted to undertake the post construction (6 month) survey of the Barrow and Walney OWFs and export cables.
Series2014, EGS, Walney, Seabed Monitoring Survey
EGS International Ltd (EGSi) were contracted to undertake a post-construction survey of a number of selected turbines, one substation and several array cables within WOW 1 & 2. The aim of the survey was to assess the extent of any changes to seabed and scouring around the turbine monopiles and the substation compared to the previous surveys within the windfarm and also to identify any exposures along several array cables.
Series2014, NIRAS and CMACS, Walney, Year 3 Environmental Monitoring
This series contains a collection of surveys undertaken as part of the year 3 post-construction monitoring programme for the Walney offshore wind farm development. Surveys completed include an ornithological boat-based survey and benthic grabs.
Series2013, EGS, Walney, Post-Construction Monitoring Survey (June-July)
In June 2013 EGS (International) Ltd was contracted to undertake the third post construction (6 month) survey of the windfarm. The operations involved monitoring changes to seabed morphology around the turbines and substations as well as along the inter array cable and export cable routes. EGSi carried out the survey using a high frequency multibeam (MBES) system and a side-scan sonar (SSS) in conjunction with a USBL system, across each of the proposed WTGs, substation locations and export cable routes over the Walney Offshore Windfarm 1 & 2 sites.
Series2013, CMACS, Walney, Year 2 Environmental Monitoring
This series contains a collection of surveys undertaken as part of the year 2 post-construction monitoring programme for the Walney offshore wind farm development. Surveys completed include ornithological and benthic.
Series2012, EGS, Walney, November Post-Construction Survey
In November 2012 EGS (International) Ltd was contracted to undertake the second post construction (6 month) survey of the wind farm. The aim of the survey was to identify changes to seabed morphology within the wind farm and along the export cable routes. To meet the requirements of the survey EGS operated a Kongsberg EM3002D high frequency multibeam system and a Klein 3000 dual frequency side-scan sonar (SSS) in conjunction with a USBL system, across each of the proposed WTG’s, substation locations and export cable routes.
Series2012, EGS, Walney, May Post-Construction Survey
In May 2012 EGS (International) Ltd was contracted to undertake a bathymetric survey in the post-construction (operational) phase of the project to determine whether there are any changes to seabed morphology at the wind farm site including inter array cables and along the export cable routes. In addition the survey covered three locations where debris from wind farm construction has been lost to the seabed. To meet this objective EGS conducted a multibeam high frequency bathymetric survey combined with seabed mapping and sub-surface hazard identification using side-scan sonar (SSS) in conjunction with a USBL system, across each of the proposed WTG, substation locations and export cable routes over the Walney Offshore Windfarm 1 & 2 sites.