2016, Fugro EMU Limited, Walney, Post Construction Survey Export Cables

2016, Fugro EMU Limited, Walney, Post Construction Survey Export Cables

Summary

Fugro EMU Limited (Fugro EMU) was contracted by DONG Energy (hereafter known as the client) to undertake two separate bathymetric surveys (survey 1 and survey 2) in the East Irish Sea, which were performed as one combined survey operation during spring 2016. This report provides information relation to survey 1 on the Walney Offshore Windfarm (WOW) 01 and 02. Survey 2 was carried out on the adjacent West of Duddon Sands Offshore Windfarm and has been reported on separately. The purpose of survey 1 was to provide detailed information on the current state of the offshore installations, inter array and export cables on WOW 01 and WOW 02, in order to fullfill the requirements of the MMO’s license conditions for a post construction survey in 2016.
Categories
Geophysical
Development
Walney
Industry
Wind
Phase
Post-construction
Organisation
Fugro EMU Limited
License
Marine Data Exchange Terms of Use

Data & downloads

Datasets