2004-2006, RSK, West of Duddon Sands, Planning Application

2004-2006, RSK, West of Duddon Sands, Planning Application

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

November 2004 - March 2006

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Contains the Scoping Response letter from the DTI, Consent Drawings for the Planning Application and the Heysham Substation Environmental Statement

Categories:
Archaeology
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Reports
6

Deep dive in the data

Choose what you wish to look into:

Dataset

|

Report

|

Other

2004, Department of Trade and Industry, West of Duddon ...

2006, RSK, Figure 1 (Revision 1) Jurisdiction Areas for...

2006, RSK, West of Duddon Sands Offshore wind farm, Fig...

Extension to Heysham Substation Environmental Impact As...

Figure 3 (Revision 1) Application Boundary & Limits...

Figure 4 (Revision 1) Application Boundary & Limits...