2006, Barrow Offshore Wind Farm, Onshore Study, Investigation into the Recovery of Cable Installation  in Heysham-Middleton, Lancashire

2006, Barrow Offshore Wind Farm, Onshore Study, Investigation into the Recovery of Cable Installation in Heysham-Middleton, Lancashire

Summary

This project examines surveys and assessment of the onshore cable route undertaken on Sunday July 30 2006 and Tuesday August 22 2006. The fieldwork was carried out to check the site condition. The surveys concluded that vegetation recovery was good although in one area the creation of recreational facilities has taken precedence over any botanical and other wildlife interest.