2014, EGS, Barrow, Geophysical Survey

2014, EGS, Barrow, Geophysical Survey

Summary

DONG Energy Power contracted EGSi to undertake a hydrographic and geophysical survey in the post-construction (operational) phase of the project to determine, changes to seabed morphology and classify targets on the seabed, including exposed cables and rock dumping areas, along the export cable route. he data acquisition took place between September-October 2014 on the research vessel, MV Xploer. To meet this objective EGS conducted a multibeam high frequency bathymetric survey combined with seabed mapping and sub-surface hazard identification using side-scan sonar (SSS).
Categories
Geophysical
Development
Barrow
Industry
Wind
Phase
Post-construction
Organisation
EGS
License
Marine Data Exchange Terms of Use

Data & downloads

Datasets