2013-2017, Forewind, Zone 3 - Dogger Bank, West Met Mast Wind and Wave and CTD Data

2013-2017, Forewind, Zone 3 - Dogger Bank, West Met Mast Wind and Wave and CTD Data

Summary

Forewind has installed 2 meteorological masts within the Dogger Bank Offshore Wind Farm Round 3 Development Zone. Dogger Bank East (DBE) was installed during March 2013 and Dogger Bank West (DBW) was installed during September 2013. Both met masts were deployed by Fred Olsen United. The suction bucket foundation and lattice towers were put in place by the jack-up vessel Brave Tern. This series contains the following datasets for the Dogger Bank West (DBW) met mast: Raw 10 minute data from 15 December 2013 to 19 September 2017 Cleaned 10 minute data from 24 July 2013 to 01 July 2014 The following reports are also included: Calibration certificates, Logger codes, Operations and Maintenance reports and General Dogger Bank met mast information The raw data was cleaned and supplied to Forewind by the SSE wind assessment team.
Categories
MeteorologyMetocean
Development
Zone 3 - Dogger Bank
Industry
Wind
Phase
Post-construction
Organisation
Forewind
License
Marine Data Exchange Terms of Use

Data & downloads

Datasets