2013-2017, Forewind, Zone 3 - Dogger Bank, East Met Mast Wind Wave and CTD Data

2013-2017, Forewind, Zone 3 - Dogger Bank, East Met Mast Wind Wave and CTD Data

Summary

Forewind has installed 2 meteorological masts within the Dogger Bank Offshore Wind Farm Round 3 Development Zone. Dogger Bank East (DBE) was installed during March 2013 and Dogger Bank West (DBW) was installed during September 2013. Both met masts were deployed by Fred Olsen United. The suction bucket foundation and lattice towers were put in place by the jack-up vessel Brave Tern. This series contains the following datasets for Dogger Bank East (DBE) met mast: Raw 10 minute data from 15 December 2013 to 9 September 2014 Cleaned 10 minute data from 26 March 2013 to 11 August 2014 Both raw and cleaned data from installation to 15th December 2013 has previously been submitted. For each Dogger Bank met mast the following reports are included: Calibration certificates Logger codes Operations and Maintenance reports General Dogger Bank met mast information The raw data was cleaned and supplied to Forewind by the SSE wind assessment team.
Categories
MeteorologyMetocean
Development
Zone 3 - Dogger Bank
Industry
Wind
Phase
Post-construction
Organisation
Forewind
License
Marine Data Exchange Terms of Use

Data & downloads

Datasets