2007 - 2008, RHDHV, Dudgeon, Environmental Statement

2007 - 2008, RHDHV, Dudgeon, Environmental Statement

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

September 2026

Collection date:

January 2007 - December 2008

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Dudgeon Offshore Wind Farm is located on relatively flat, uniform seabed over 32km north of the town of Cromer in north Norfolk. The project is subject to an Environmental Impact Assessment to systematically examine and assess the impacts and effects of the development on the environment. The whole Environmental Statement, including appendices, is ...

Categories:
Archaeology
Benthic Ecology
Birds
Coastal Processes
Environmental Statements
Geophysical
Intertidal Ecology
Marine Mammals
Meteorology
Metocean
Noise
Shipping and Navigation
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
16
Reports
29

Deep dive in the data

Choose what you wish to look into:

Dataset

|

Report

|

Other

2009, Royal Haskoning, Dudgeon Offshore Wind Farm, Envi...

2009, Royal Haskoning, Dudgeon Offshore Wind Farm, Envi...

2009, Royal Haskoning, Dudgeon Offshore Wind Farm, Envi...

2009, Royal Haskoning, Dudgeon Offshore Wind Farm, Envi...

2009, Royal Haskoning, Dudgeon Offshore Wind Farm, Envi...

2009, Royal Haskoning, Dudgeon Offshore Wind Farm, Envi...

2009, Royal Haskoning, Dudgeon Offshore Wind Farm, Envi...

2009, Royal Haskoning, Dudgeon Offshore Wind Farm, Envi...

2009, Royal Haskoning, Dudgeon Offshore Wind Farm, Envi...

2009, Royal Haskoning, Dudgeon Offshore Wind Farm, Envi...

2009, Royal Haskoning, Dudgeon Offshore Wind Farm, Envi...

2009, Royal Haskoning, Dudgeon Offshore Wind Farm, Envi...

2009, Royal Haskoning, Dudgeon Offshore Wind Farm, Envi...

2009, Royal Haskoning, Dudgeon Offshore Wind Farm, Envi...

2009, Royal Haskoning, Dudgeon Offshore Wind Farm, Envi...

Appendix 20.1 - EnviroCheck report

2009, Royal Haskoning, Dudgeon Offshore Wind Farm, Environmental Statement, Appendix 10.1 - Subtidal benthic grab survey methodology

As part of the EIA process Dudgeon Offshore Wind Limited (DOW) carried out a survey programme to establish the extent and composition of the benthic assemblage and sediment characterstics within the wind farm and its surrounding environs. This enabled DOW to characterise the assemblage and its component communities. The methodology for the surveys was agreed with Natural E...
Read More

Within this package:

Name
File Type
Size
Date

_metadata

17 May 2021

Appendix 10.1 Subtidal benthic grab survey methodology

.pdf

33.74 KB

6 May 2021

Thumbs

.db

9.00 KB

6 May 2021

dataname

.txt

88.00 bytes

6 May 2021