2017, NIRAS Consulting Ltd., Greater Gabbard Offshore Wind Farm, Year 5 Post Construction Benthic Survey

2017, NIRAS Consulting Ltd., Greater Gabbard Offshore Wind Farm, Year 5 Post Construction Benthic Survey

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

February 2026

Collection date:

August 2017 - October 2017

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

August 2025

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Greater Gabbard Offshore Wind farm located in the Outer Thames Estuary, is owned by Greater Gabbard Offshore Winds Limited. The project was commissioned in 2008, construction commenced in 2009 and was completed in 2012, the wind farm is now fully operational.The primary aim of the monitoring survey is to determine whether there have been any change...

Categories:
Benthic Ecology
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Reports
2

Deep dive in the data

Choose what you wish to look into:

Dataset

|

Report

|

Other

Technical Report Appendix 5 and 10 (Grab and Trawl Phot...

Year 5 Post-Construction Benthic Survey Technical Repor...

Select a Package from the list on the left to see more information about it