Series2017, NIRAS Consulting Ltd., Greater Gabbard Offshore Wind Farm, Year 5 Post Construction Benthic Survey
Greater Gabbard Offshore Wind farm located in the Outer Thames Estuary, is owned by Greater Gabbard Offshore Winds Limited. The project was commissioned in 2008, construction commenced in 2009 and was completed in 2012, the wind farm is now fully operational.The primary aim of the monitoring survey is to determine whether there have been any changes in benthic communities within and around the wind farm site and whether any such changes can be attributable to the Project. Related objectives included the distribution of marine habitats and the identification of any habitats or species of conservation interest that may be present. Year five post-construction monitoring was undertaken in 2017 for comparison with data from year one post-construction monitoring in 2013, baseline survey completed in 2009, with reference to data from 2005 and 2010 EIA surveys. Grab, trawl, ROV colonisation and dropdown camera surveys are reported here. The survey programme comprised of Forty-nine mini-Hamon grab stations (triplicate samples were to be collected at all stations and analysed for Particle Size Analysis Total Organic Carbon and infaunal analysis). Five Drop Down Video stations for the investigation of epifauna, plus extra deployments on any grab stations where a sample could not be obtained. Twenty-six 2-metre beam trawls, towed for 300 metres. ROV dives on two turbines to investigate monopole and scour protection colonisation.
Series2015, ADUS DeepOcean, Greater Gabbard, Bathymetry Survey
Adus DeepOcean were contracted by DeepOcean UK1 on behalf of Greater Gabbard Offshore Wind Limited (GGOWL) to undertake the post construction bathymetry of the Greater Gabbard windfarm. The aim of the survey was twofold: firstly to satisfy the consent conditions stipulated within the Marine Licence (number: L/2013/00076/5) issued by the Marine Management Organisation and secondly to provide baseline survey data of foundation basis and cable routes, for engineering purposes. The survey was conducted between the 1st July and 20th September 2015. The survey requirements comprise the acquisition of acoustic data along cable routes, around structures and other subsea features with the following coverage: · 50m either side of inter array cable routes; · 50m radius from jack up vessel footprint locations; · 50m either side of concrete mattresses; · A boxed area 0f 90x180meters around each monopile · 50m radius around each OSP (where vessel access permits); · 20m either side of inter array cable routes in the region of the Inner Gabbard and Galloper sandbanks. · 50m either side of export cable routes;
Series2014, Brown and May Marine, Greater Gabbard, Elasmobranch Long-Line Survey
The Marine Licence L/2013/00076 conditions associated with the Greater Gabbard Offshore Wind Farm (GGOWF) stipulate that elasmobranch monitoring must be undertaken post-construction. In order to fulfil these conditions a second post-construction longline survey targeting elasmobranchs was undertaken between the 4th and 7th August 2014 within and adjacent to the GGOWF and the cable route. The aim of the survey was to determine the abundance and distribution of elasmobranch species and the survey methodology was developed in consultation with the Marine Management Organisation (MMO). A total of 14 longlines were shot and hauled over the survey duration in which four species of elasmobranch were recorded; lesser spotted dogfish (Scyliorhinus canicula), thornback ray (Raja clavata), smoothhound sp. (Mustelus sp.) and tope (Galeorhinus galeus). S. canicula was the most abundant species recorded during the survey with the highest numbers caught within the wind farm. R. clavata was most abundant at stations along the export cable. S. canicula and G. galeus were recorded in the four sampling areas and all four elasmobranch species were caught within the wind farm. The smallest number of elasmobranch species were found at the export cable control stations. The majority of S. canicula and G.galeus caught during the survey were females, whereas for R. clavata and Mustelus sp. a higher proportion of males were recorded. Aggregations of elasmobranchs by sex and maturity could be in response to seasonal factors, changes in reproductive behaviour or increased prey availability. A recent review by the MMO (MMO, 2014) in relation to elasmobranchs and electromagnetic fields (EMFs) generated by offshore wind cabling concluded that there is “no evidence to suggest that EMFs pose a significant threat at the site or population level”.
Series2014, ADUS DeepOcean, Greater Gabbard, Bathymetry Survey (Inter Array Cables, Monopiles and Jack Up Vessel Zones)
SSE contracted Adus DeepOcean to perform a multibeam bathymetry and sidescan sonar survey of the Greater Gabbard Offshore windfarm. Area to be surveyed for this project comprised all 140 turbines and inter-array cables, which are split into two sites and encompass an area of approximately 146 km2. The survey requirements comprised the acquisition of acoustic data along cable routes, around structures and other subsea features with the following coverage: 50m either side of inter array cable routes; 50m either side of concrete mattresses; A boxed area 0f 90x180meters around each monopile 50m radius around each OSP (where vessel access permits);20m either side of inter array cable routes in the region of the Inner Gabbard and Galloper sandbanks.
Series2014, ADUS DeepOcean, Greater Gabbard, Bathymetry Survey Export Cable
SSE contracted Adus DeepOcean to perform a multibeam bathymetry survey of a 50 metre zone around export cables L1, L2 and L3 and the IC cable connecting the Galloper and Gabbard Windfarms.
Series2014, Brown and May Marine, Greater Gabbard, Elasmobranch Long Line Survey
The Marine Licence L/2013/00076 conditions associated with the Greater Gabbard Offshore Wind Farm (GGOWF) stipulate that elasmobranch monitioring must be undertaken post-construction. In order to fulfil these conditions a post-construction longline survey targeting elasmobranchs was undertaken between the 13th and 16th May 2014 within and adjacent to the GGOWF and the cable route. The aim of the survey was to determine the abundance and distribution of elasmobranch species and the survey methodology was developed in consultation with the Marine Management Organisation (MMO). A total of fourteen longlines were shot and hauled over the four day survey in which five species of elasmobranch were recorded; lesser spotted dogfish (Scyliorhinus canicula), thornback ray (Raja clavata), spurdog (Squalus acanthias), smoothhound sp. (Mustelus sp.) and tope (Galeorhinus galeus). S. canicula were the most abundant species recorded during the survey with the highest numbers caught within the wind farm. R. clavata and S. acanthias were most abundant along the export cable sampling area and the cable control sampling area respectively. S. canicula and R. clavata were recorded at all four sampling areas and all five elasmobranch species were caught at stations along the export cable. The smallest number of elasmobranch species was found at the wind farm control stations.
Series2013-2014, HR Wallingford, Greater Gabbard, Post-Installation Scour Assessment
SSE Offshore Wind Generation requested HR Wallingford to perform a scour review based on the 2013 inter-array cable survey data at the Greater Gabbard Offshore Wind Farm (OWF). The survey data was assessed at every turbine location to provide descriptive scour parameters and to provide a baseline description for future asset management. As part of the existing licence agreement with the Marine Management Organisation, SSE is required to perform yearly (for up to three years) high-resolution swath-bathymetry surveys of the OWF cable route in order to assess the extent of any changes in morphology relative to the pre-construction baseline survey. HR Wallingford has previously investigated whether apparent magnitude of seabed movements observed in the 2013 survey data had a physical basis or were attributable to inaccuracies and errors in surveying and/or GPS positioning. The results of this study demonstrated that the 2013 survey data was subject to a total vertical uncertainty of ±0.35 m. The total vertical uncertainty (TVU) is defined by the International Hydrographic Organisation (2008) as that component of the total propagated uncertainty (TPU) in the vertical dimension, where TPU is the result of uncertainty propagation, when all contributing measurement uncertainties, both random and systematic, have been included in the propagation. The report presented analysis of bed level movements across the wind farm array cable routes. The current report evaluates the foundation scour development using the same data.
Series2013-2014, RHDHV and ESS Ecology, Greater Gabbard, Ornithological Survey Reports and Data
This series contains the annual and monthly reports as well as the raw data for the 2013-2014 Greater Gabbard bird survey carried out as part of the 2013/2014 construction monitoring, in accordance with FEPA licence requirements. Conditions contained in the project’s Food and Environment Protection Act (FEPA) licence 33097/10/1 (dated 29th October, 2010), set the requirement for additional ornithological monitoring of the site, which includes the wind farm area, 1km buffers, 4km buffers and a control area, with surveys during pre-construction, construction and operation. In consultation with Natural England, the Joint Nature Conservation Committee (JNCC) and the Marine Management Organisation (MMO), which has replaced the Marine and Fisheries Agency (MFA), an Ornithological Monitoring Protocol (GGOWL 2007) was subsequently developed for the project. The monitoring protocol includes a programme of monthly boat-based transect surveys, following the methodology as recommended by Camphuysen et al. (2004). In addition, marine mammals were recorded as incidental sightings.
Series2013, CMACS, Greater Gabbard, Year 1 Benthic Ecology and Turbine Colonisation Survey
Year one post-construction monitoring of marine benthic organisms and communities in and around the Greater Gabbard Offshore Wind Farm (GGOWF) and export cable route was undertaken in 2013 for comparison with data from a baseline survey completed in 2009 prior to commencement of construction, with further reference to data from 2005 and 2010 EIA surveys. Grab, trawl and drop-down camera surveys are reported here, while an ROV colonisation survey is reported separately. The sediment types and distributions and faunal communities within and around the Greater Gabbard Offshore Wind Farm have generally remained reasonably similar throughout the survey programme thus far. While mud content decreased to a certain extent in 2013 compared to 2009, with some apparent effects upon faunal composition, levels were demonstrated as having returned to those recorded in 2005. When considered alongside fluctuations observed at reference stations, it seems natural variability most likely arising from storm events are attributable, rather than any effects of the construction and operation of the wind farm.
Series2013, CT Offshore, Greater Gabbard, Multibeam Survey
Greater Gabbard Offshore Winds Ltd have recently completed the construction of a wind farm approximately 14mi east of Suffolk coast. The offshore wind farm consists of 152 Wind Turbine Generators (WTGs) with a gross nameplate capacity of approximately 504MW. The project is now fully operational and the construction was completed in September 2012. GGOWL signed up CT Offshore to conduct survey of the inter array cables. Water depths along the CTO scope of work vary between approx. 22 (LAT) at the point closest to the shore and 32m (LAT) furthest south west. Inspection of seabed bathymetry along the route of all 152 IA cable routes extending to 50m either side of each cable (i.e. 100m wide survey centred on cable). The cable route surveys should identify any exposed or free spanning sections of cable, any cable loops emergent from the seabed and the presence and location of any installed cable protection systems. Where possible, the IA cable surveys should cover the full span of the cable up to and including the cable monopile entry point and should illustrate exposed and free spanning cable in the vicinity of the monopiles. Where it is not possible to survey up to the monopole, the cable survey should extend as close to the structure as is deemed safe to do so. The survey must quantify the seabed position relative to lowest astronomical tide (LAT) thereby enabling any seabed movements relative to seabed position in 2009 to be quantified. The survey of the inter array cables shall include survey of the OSP’s (IGSUB and GASUB). Multibeam Survey is conducted to achieve the above results.
Series2013, National Physical Laboratory, Greater Gabbard, Modelling of Underwater Noise
The Food and Environment Protection Act (FEPA) Licence (33097/07/0) for the Greater Gabbard Offshore Wind Farm (GGOWF) required the subsea noise during the operational phase of the wind farm to be measured to assess ‘various frequencies across the sound spectrum at a selection of locations immediately (adjacent to), within and outside the array at varying distances’. The full wording of licence condition 9.9 is stated below: ‘The Licence Holder must make provision during the construction phase of the wind farm to install facilities to enable subsea noise and vibration from the turbines to be assessed and monitored during the operational phase of the wind farm. Before completion of the construction phase the Licence Holder must specify how it proposes to measure subsea noise and vibrations to the Licensing Authority in order to fulfil the monitoring requirement outlined in Annex 1 attached to this Licence. The specification must include assessment of various frequencies across the sound spectrum at a selection of locations immediately, within and outside the array at varying distances.’ Although the licence condition sates ‘monitoring’ as a requirement, in situ measurements alone may not necessarily result in an increase of understanding of the potential noise resulting from GGOWF, compared with background or ambient noise in the area. Evidence from the Gunfleet Sands offshore wind farm (Nedwell et al., 2011) suggests that the type of wind turbine operating at GGOWF is not very ‘noisy’ compared with typical coastal ambient noise. This may particularly be the case around the GGOWF site where the density of surface vessel activity is relatively high. This report describes work carried out by the National Physical Laboratory (NPL), on behalf of Greater Gabbard Offshore Winds Limited, to assess the likely noise levels resulting from operation of the entire GGOWF, with a methodology that is considered most appropriate to address the underlying requirements of the relevant licence condition.
Series2012-2013, RHDHV and ESS Ecology, Greater Gabbard, Ornithology Survey (Construction and operation)
This series contains the annual and monthly reports as well as the raw data for the 2012-2013 Greater Gabbard bird survey carried out as part of the 2012/2013 construction monitoring, in accordance with FEPA licence requirements. Conditions contained in the project’s Food and Environment Protection Act (FEPA) licence 33097/10/1 (dated 29th October, 2010), set the requirement for additional ornithological monitoring of the site, which includes the wind farm area, 1km buffers, 4km buffers and a control area, with surveys during pre-construction, construction and operation. In consultation with Natural England, the Joint Nature Conservation Committee (JNCC) and the Marine Management Organisation (MMO), which has replaced the Marine and Fisheries Agency (MFA), an Ornithological Monitoring Protocol (GGOWL 2007) was subsequently developed for the project. The monitoring protocol includes a programme of monthly boat-based transect surveys, following the methodology as recommended by Camphuysen et al. (2004). In addition, marine mammals were recorded as incidental sightings.