2017, NIRAS Consulting Ltd., Greater Gabbard Offshore Wind Farm, Year 5 Post Construction Benthic Survey

2017, NIRAS Consulting Ltd., Greater Gabbard Offshore Wind Farm, Year 5 Post Construction Benthic Survey

Summary

Greater Gabbard Offshore Wind farm located in the Outer Thames Estuary, is owned by Greater Gabbard Offshore Winds Limited. The project was commissioned in 2008, construction commenced in 2009 and was completed in 2012, the wind farm is now fully operational.The primary aim of the monitoring survey is to determine whether there have been any changes in benthic communities within and around the wind farm site and whether any such changes can be attributable to the Project. Related objectives included the distribution of marine habitats and the identification of any habitats or species of conservation interest that may be present. Year five post-construction monitoring was undertaken in 2017 for comparison with data from year one post-construction monitoring in 2013, baseline survey completed in 2009, with reference to data from 2005 and 2010 EIA surveys. Grab, trawl, ROV colonisation and dropdown camera surveys are reported here. The survey programme comprised of Forty-nine mini-Hamon grab stations (triplicate samples were to be collected at all stations and analysed for Particle Size Analysis Total Organic Carbon and infaunal analysis). Five Drop Down Video stations for the investigation of epifauna, plus extra deployments on any grab stations where a sample could not be obtained. Twenty-six 2-metre beam trawls, towed for 300 metres. ROV dives on two turbines to investigate monopole and scour protection colonisation.
Categories
Benthic Ecology
Development
Greater Gabbard
Industry
Wind
Phase
Post-construction
Organisation
NIRAS
License
Marine Data Exchange Terms of Use

Data & downloads

Reports