Summary
Year 3 Birds & Marine Mammal Post-Construction surveys and assessment for the operational Blyth Offshore Demonstrator Array 2 wind farm. The 2020-21 bird and marine mammal boat surveys covered the inner turbine array (described as ‘Array 2’in the project ES) plus a 3km buffer, with a 1km transect separation (as agreed with NE and the MMO). The surv...

