Summary
During January 2024 XOCEAN were tasked to perform a multibeam echosounder and Pseudo SSS survey over the IAC corridors, 88 x (350m x 350m) WTG boxes within the Sheringham Shoal Windfarm Array and two export cable routes. The aim of the survey was to investigate anything which might influence integrity strategies, including scour, debris, conditi...