Summary
Benthic survey results of grab and video sampling conducted over the Thanet Wind Farm to assess the potential impacts of construction works on the benthic ecology across the site. The survey was conducted in September 2022.
Benthic survey results of grab and video sampling conducted over the Thanet Wind Farm to assess the potential impacts of construction works on the benthic ecology across the site. The survey was conducted in September 2022.