2013, E.ON Climate and Renewables, Humber Gateway, Export Cables Laying Plan

2013, E.ON Climate and Renewables, Humber Gateway, Export Cables Laying Plan

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

March 2013 - July 2013

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

The Humber Gateway Export Cables Laying Plan has been produced as a requirement of the Humber Gateway Marine Licence, and submitted to the Marine Management Organisation. The Plan sets out the route of the two export cables and the methodology of cable laying and installation. The export cables have been installed in Quarter 3 and 4 of 2013. 

Categories:
Engineering Design
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Reports
1