2015, Harkand Andrews Survey, Humber Gateway, Geophysical Survey

2015, Harkand Andrews Survey, Humber Gateway, Geophysical Survey

Summary

Post construction survey 2015 for Humber Gateway Offshore Wind Farm conducted by Harkand Andrews Survey between 17 March - 28 May 2015. The extent of the areas covered by the post construction site survey are as follows: - Array Cables: the array cables were surveyed in 15m wide corridors, using the array cable as the centre line. - Export Cable Route: each export cable was surveyed in 15m wide corridors, using the export cable as the centre line. - Turbine and offshore substation foundations: The turbine foundations and substation foundation were surveyed for 100m around the outside circumference of the turbine base.
Categories
Geophysical
Development
Humber Gateway
Industry
Wind
Phase
Post-construction
Organisation
Harkand Andrews Survey
License
Marine Data Exchange Terms of Use