
2015, Harkand Andrews Survey, Humber Gateway, Geophysical Survey
Summary
Post construction survey 2015 for Humber Gateway Offshore Wind Farm conducted by Harkand Andrews Survey between 17 March - 28 May 2015.
The extent of the areas covered by the post construction site survey are as follows:
- Array Cables: the array cables were surveyed in 15m wide corridors, using the array cable as the centre line.
- Export Cable Route: each export cable was surveyed in 15m wide corridors, using the export cable as the centre line.
- Turbine and offshore substation foundations: The turbine foundations and substation foundation were surveyed for 100m around the outside circumference of the turbine base.
Data & downloads
Datasets
