2006-2007, Environmentally Sustainable Systems Ltd., Kentish Flats, Fifth Ornithological Monitoring Report

2006-2007, Environmentally Sustainable Systems Ltd., Kentish Flats, Fifth Ornithological Monitoring Report

Summary

This Fifth and Final Ornithological Monitoring report which covers Year 6 of the bird monitoring programme, presents and analyses the results of the 17 boat surveys from 10th December 2006 to 21st November 2007 for the Kentish Flats offshore wind farm, and aerial data collected during two surveys flown on 3rd and 18th February 2007 in the area surrounding the wind farm. The purpose of this report is to meet the FEPA license monitoring requirements determined by DEFRA (following advice from English Nature, now Natural England) as a planning consent condition for the construction of the Kentish Flats project. Population estimates with means and standard errors for the wind farm site and buffer zone and for the control site have been calculated using the data collected during each of the 108 boat surveys since October 2001. Standard errors have been updated and improved by the larger (6-year) dataset. Relative abundance indices have been calculated with standard errors for all WWT aerial surveys covering Kentish Flats.
Categories
BirdsMarine Mammals
Development
Kentish Flats
Industry
Wind
Phase
Post-construction
Organisation
Environmentally Sustainable Systems Ltd.
License
Marine Data Exchange Terms of Use

Data & downloads

Reports