2014, Royal Haskoning DHV, Kentish Flats Extension, Intertidal Phase 1 Survey

2014, Royal Haskoning DHV, Kentish Flats Extension, Intertidal Phase 1 Survey

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

March 2024

Collection date:

September 2014 - September 2014

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2025

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

A pre-construction Phase 1 intertidal survey was undertaken for the Kentish Flats
Extension Offshore Wind Farm at the export cable landfall site, adjacent to Hampton
Pier, Herne Bay. The objective of the survey was to provide a baseline for identifying
any changes that may occur following construction of the landfall site, due to occur in
July 2015...

Categories:
Intertidal Ecology
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'