2015, EGS, Lincs, LS16 Jack-Up Clearance Survey
Summary
Data & downloads
Datasets
Data Highlights
Related Pages
Series2021-2025, Orsted, Lincs, Offshore Sub-Station Wave Radar
Wave height, period and directional measurements from a wave radar installed in the OSS of LINCS Wind Farm. Dataset covers Dec-2021 to April-2025, until 19-May-2022 dataset only shows wave height due to a head malfunction.
Series2017, EGS, Lincs Offshore Wind Farm, Post Construction Geophysical Survey
EGS (International) Ltd was contracted by Centrica Renewable Energy Limited (CREL) to carry out a geophysical survey of the Lincs OWF, located offshore of Skegness on the east coast of England. The main objective of the survey was to fulfil the Lincs Operations and Maintenance requirements. 24h survey operations were undertaken by the EGS Pioneer using multibeam echosounder (MBES) and side scan sonar (SSS) equipment. The vessel was mobilised in Lowestoft on 23rd June 2017, with survey operations commencing the following day (24th June). Survey operations were completed by 30th June, with the EGS Pioneer subsequently transiting back to Lowestoft and completing demobilisation the following day (1st July). High resolution multibeam and side scan sonar was acquired with 100% bathymetric and side scan coverage was achieved around all 75 turbines and the 4 substation legs. Detailed horizontal and vertical measurements were taken at these locations and were compared to measurements made in previous post-construction surveys in order to identify any trends.
Series2017, EGS, Lincs Offshore Wind Farm, Lincs LS23 and LS65 Clearance Survey
EGS International Ltd (EGSi), were contracted by Centrica Renewable Energy Limited (CREL) to undertake a side scan sonar (SSS) and multibeam (MBES) clearance survey centred on the no cable zone (400m x 400m) adjacent to WTGs LS23 & LS65 at the Lincs Offshore Wind Farm. The surveys were required to support the safe emplacement of a jack-up vessel adjacent to the WTG for maintenance purposes. This series details the operations and results of the survey around all turbines.
Series2017, EGS, Lincs Offshore Wind Farm, LS68 Clearance Survey
EGS International Ltd (EGSi), were contracted by Centrica Renewable Energy Limited (CREL) to undertake a side scan sonar (SSS) and multibeam (MBES) clearance survey centred on the no cable zone (400m x 400m) adjacent to LS68 WTG at the Lincs Offshore Wind Farm. The surveys were required to support the safe emplacement of a jack-up vessel adjacent to the WTG for maintenance purposes. This series details the operations and results of the survey around the LS68 turbine.
Series2016, EGS, Lincs, Geophysical Survey
EGS International Ltd (EGSi) were contracted by Centrica Renewable Energy Limited (CREL) to undertake the 2016 post-construction (year 4) hydrographic and geophysical survey of the Lincs OWF. These works were conducted as part of a wider post-construction monitoring operation which included survey works on the adjacent L and ID windfarm. Survey works on the Lincs OWF were predominantly carried out using the vessel EGS Pioneer. Vessel mobilisation commenced on 18th August and were completed on 22nd August 2016; this period included vessel downtime on 19th – 21st August which caused a delay in the mobilisation. Survey operations on board the EGS Pioneer were carried out between 22nd August and 3rd September 2016 with the demobilisation taking place later on the same day. Following the main survey the Wessex Explorer was mobilised to survey a potential UXO target in close proximity to LS19.
Series2015, EGS, Lincs, Hydrographic, Geophysical and Benthic Survey
EGS International Ltd (EGSi) were contracted by Centrica Renewable Energy Limited (CREL) to undertake the 2015 post construction (Year 3) hydrographic and geophysical surveys of the Lincs and L and ID (Lynn and Inner Dowsing) windfarm array cable routes. Additionally, a benthic survey was required for the Lincs OWF post construction survey. This series details the operations and results of the surveys.
Series2015-2016, HiDef Aerial Surveying Ltd., Lincs, Aerial Ornithological Survey
HiDef Aerial Surveying Limited (“HiDef”) has been commissioned by Lincs Wind Farm Limited (“LWFL”) to undertake ultra-high resolution digital video aerial surveys as part of a programme to monitor the effects of the construction and operation of the Lincs Wind Farm (“Lincs”) project on seabirds. The first year of post-construction monitoring was reported in the first annual post-construction aerial ornithological monitoring report (HiDef document HP00045 703) (“the year one report”), which was approved by the Licensing Authority in January 2015, subject to methodology changes which were then implemented within the second annual post-construction aerial ornithological monitoring report (HiDef document HP00048 – 702; “the year two report”), which was approved by the Licensing Authority in September 2015 and which was again subject to minor analytical changes. The Post-Construction Aerial Ornithological Monitoring Report in this series describes the results from the final year of post-construction monitoring (April 2015 – March 2016) and combines these with the results of the previous years’ monitoring. In doing so, this report seeks to fully discharge the Marine Licence conditions relating to ornithological survey (i.e. through the results being accepted as representing the third and combined years of post-construction monitoring). In addition reports and data for the tasks undertaken in support of the January 2016 - March 2016 surveys which were part of the final year of post-construction monitoring (April 2015 - March 2016) have been provided.
Series2015, EGS, Lincs, LS28 Turbine Clearance Survey
EGS (International) Ltd, on behalf of Centrica, undertook a Side-Scan Sonar (SSS) and Multibeam (MBES) clearance survey centered on the no cable zones (500m by 500m) around WTGs LS28 (on the Lincs site), and ID16 and ID24 (on the Inner Dowsing Site). The areas surveyed were identified by Centrica for the upcoming works on the aforementioned turbines and respond to the need to have a jack-up vessel in the locality to complete the works. This series details the operations and results of the survey around all turbines. Please note the data provided within this series only covers the Lincs site, whilst the report covers both the Lincs and Inner Dowsing Offshore Wind Farms.
Series2014, DNV GL, Lincs Offshore Wind Farm, Cable Protection Assessment
Lincs Wind Farm Limited has approached DNV GL to discuss potential cable remedial works in the Lincs offshore wind farm which are planned to be carried out in 2015. Lincs has been in commercial operation since September 2013, The main method of protection for the array and export cables was burial, but some cable sections did not achieve the targeted burial depth. The Customer would like to reassess the risks to the cables and the most suitable methods of additional protection, if any, and asked DNV GL to outline a methodology for this based on the published DNV pipeline standards and recommended practices. DNV GL extracted methodologies from DNV GL pipeline standards and recommended practices in order to develop a coherent approach which enables quantitative assessment of risks to specific cable sections.
2014, RSK, Lincs, Saltmarsh Botanical Monitoring Survey
As part of the Marine Management Organisation (MMO), Lincs Marine Licence (Licence Number: L/2011/00111/8) and under Natural England request, RSK was commissioned by Centrica to undergo botanical surveys to monitor the recovery of saltmarsh vegetation affected following cable trenching operations associated with the Lincs Offshore Wind Farm. This report presents the results of the third year of botanical monitoring surveys carried out in connection with the trenching of two cables (Nearshore Western Cable and Nearshore Eastern Cable) for the Lincs Offshore Wind Farm. It provides the survey findings for botanical monitoring completed in August 2014 for both cables. The aim of the botanical survey was to monitor vegetation recovery in areas crossed by cable installation activities (impacted areas) with vegetation in unaffected areas (control areas). The botanical monitoring consisted of a National Vegetation Classification (NVC) survey of the consent corridor; seven transects located in the main saltmarsh zones and a subjective assessment made during the walkover. These methods are outlined in the original ecology report (RSK 2011a) and approved by Natural England (NE) and the Marine Management Organisation (MMO) during consultation process in 2011 (RSK 2011b, c).
2014, EGS, Lincs, Hydrographic, Geophysical and Benthic Survey
EGS International Ltd (EGSi) were contracted by Centrica Renewable Energy Limited (CREL) to undertake the 2014 post construction hydrographic and geophysical surveys of the Lincs windfarm and export cable routes. And 2014 post construction environmental benthic survey of the Lincs offshore windfarm (OWF). EGSi sub-contracted Benthic Solutions Limited (BSL) to undertake the benthic element of the survey.
Series2014, EGS, Lincs, Turbine LS28 Clearance Survey
After completion of the depth of burial survey of the Lincs Array Cables project, and the Export Cable survey, EGS (International) Ltd, on behalf of Centrica, undertook a Side-Scan Sonar (SSS) and Multibeam (MBES) clearance survey of the no cable zones (500m by 500m) around WTGs LS28 (on the Lincs site) and ID24 (on the Inner Dowsing Site). The areas surveyed were identified by Centrica for the upcoming works on the aforementioned turbines and the need to get a jack up vessel in the locality to complete the works. This report details the operations and results of the survey around LS28.