2008, RPS, Lincs, UXO Risk Appraisal and Geophysical Survey Review

2008, RPS, Lincs, UXO Risk Appraisal and Geophysical Survey Review

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

October 2008 - October 2008

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

The proposed Lincs Offshore Wind Farm (OWR) developed by Centrica Energy, lies
on the eastern (seaward) side of the consented Lynn and Inner Dowsing wind farms,
approximately 8-12km off the coast of Lincolnshire. Two export cables will connect
the wind farm to the grid, with landfall to the east of the mouth of the River Nene.
The region has been h...

Categories:
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Reports
1