2015, EGS, Blyth Demonstration Site, Annex I Site Survey

2015, EGS, Blyth Demonstration Site, Annex I Site Survey

Summary

In June 2015, EDF Energy Renewables (EDF) contracted EGS International Ltd (EGSi), supported by Benthic Solutions Limited (BSL) to undertake a pre-construction geophysical, bathymetric and Annex I habitat survey within the Blyth Offshore Demonstrator Site. The objective of the benthic survey was to provide sufficient information to identify any features of conservation importance, such as Annex I habitats, that may have an impact on the installation and/or consenting process within the Array 2 area and Export Cable Route area. This series contains the Habitat Assessment Reports.
Categories
Benthic EcologyGeophysical
Development
Blyth Demonstration Site
Industry
Wind
Phase
Pre-construction
Organisation
EGS
Available in this series
2 Reports

Data & downloads

Reports

Data Highlights