2005, E.ON, London Array, Proposed Overhead Line Works at Cleve Hill

2005, E.ON, London Array, Proposed Overhead Line Works at Cleve Hill

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

June 2005 - June 2005

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

This project examines the environmental effects of the proposed overhead line connection works at Cleve Hill near Faversham, Kent for the London Array offshore wind farm.  The environmental assessment was carried out by National Grid.

National Grid has applied to the Department of Trade and Industry (DTI) under Section 37 of the Electricity Act 19...

Categories:
Onshore
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Reports
1