2010, Osiris Projects, Walney Offshore Wind Farm, Phase 2 Export Cable Route Surveys

2010, Osiris Projects, Walney Offshore Wind Farm, Phase 2 Export Cable Route Surveys

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

January 2010 - February 2010

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

In October, Osiris Projects were commissioned by DONG Walney (UK) Ltd to carry out an export cable route survey from the proposed Walney Offshore Windfarm (WOW 1). This survey was extended under Variation Order No1 to include a multibeam and side scan sonar survey of the Walney Offshore Windfarm (WOW2). The main objectives of the WOW 2  survey obje...

Categories:
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
3
Reports
2