2008, Osiris Projects, Barrow Offshore Wind Farm, Post-Construction Cable Route Inspection and Scour Monitoring Survey

2008, Osiris Projects, Barrow Offshore Wind Farm, Post-Construction Cable Route Inspection and Scour Monitoring Survey

Top Categories:

Geophysical

Description

On the instructions of Barrow Offshore Wind Limited, Osiris Projects were commissioned to undertake an inspection survey covering the Barrow Offshore Wind Farm export cable route, in conjunction with scour monitoring surveys at a series of selected turbine locations within the main development area. Data acquisition took place using the survey vessel MV ‘Barinthus’, during the period 10th to 15th May 2008 and on the MV 'So Fyne', during the period 15th to 30th November. High-resolution side scan sonar, swath multi-beam and single beam bathymetry data were acquired along a number of parallel survey lines, which were generally run at 25m centres, in order to accurately map the seabed along the cable route. The package contains a final report from the May surveys and a draft report from the November survey.

Dataset

Download All

C8034 Cable Route and Turbines XYZ Data

Report

Download All

C8016 Report

C8034 Report