2006, Enviros Consulting, Greater Gabbard, Sizewell Wents Flood Risk Assessment

2006, Enviros Consulting, Greater Gabbard, Sizewell Wents Flood Risk Assessment

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

July 2006 - October 2006

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

In July 2006 Enviros Consulting were commissioned by Greater Gabbard Offshore
Winds Limited (GGOWL) to undertake a flood risk assessment for the site of a
proposed sub-station at Sizewell Wents close to the existing Sizewell A Power
Station. It is proposed that this sub-station would be constructed to serve a new
offshore windfarm to be known as th...

Categories:
Onshore
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'