Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2006, Enviros Consulting Ltd., Greater Gabbard Offshore Windfarm, Sizewell Wents Flood Risk Assessment

2006, Enviros Consulting Ltd., Greater Gabbard Offshore Windfarm, Sizewell Wents Flood Risk Assessment

Top Categories:

Onshore

Description

In July 2006 Enviros Consulting were commissioned by Greater Gabbard Offshore
Winds Limited (GGOWL) to undertake a flood risk assessment for the site of a
proposed sub-station at Sizewell Wents close to the existing Sizewell A Power
Station. It is proposed that this sub-station would be constructed to serve a new
offshore windfarm to be known as the Greater Gabbard Offshore Wind Farm.

Report

Download All

Report