2007, CMACS,  Burbo Bank, Year 1 Benthic Grab Survey

2007, CMACS, Burbo Bank, Year 1 Benthic Grab Survey

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

July 2026

Collection date:

September 2007 - September 2007

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Burbo Offshore Wind Farm is a twenty-five turbine, 90MW development located in Liverpool Bay approximately 6km from the coastlines of Wirral, Crosby and Liverpool. A licence was issued to the wind farm developer, SeaScape Energy Ltd, which allows them to construct and operate the wind farm. The benthic (seabed) monitoring programme consists of annu...

Categories:
Benthic Ecology
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Data Highlights
1
Reports
1

Deep dive in the data

Choose what you wish to look into:

Dataset

|

Report

|

Other

2007, Centre for Marine and Coastal Studies Ltd., (CMAC...

Select a Package from the list on the left to see more information about it