2007, DONG Energy, Walney, Onshore Substation Survey

2007, DONG Energy, Walney, Onshore Substation Survey

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

September 2007 - September 2007

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

This project incorporates the Environmental Statement (ES) undertaken by DONG Energy in September 2007 for a proposed onshore substation at Stanah. The proposed substation is required to accommodate the power output of the proposed Walney Offshore Windfarm (WOW) Phase II. The purpose of this ES is to report on the findings and conclusions of the en...

Categories:
Onshore
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Reports
4