2015, Modus, Burbo Bank Extension, ROV and Explosive Ordnance Disposal Operations

2015, Modus, Burbo Bank Extension, ROV and Explosive Ordnance Disposal Operations

Summary

Modus Seabed Intervention was contracted by DONG Energy to conduct pre-installation works on the Burbo Bank Extension offshore wind farm. The workscope was divided into two packages – an initial investigation survey of known ferromagnetic unexploded ordnance (UXO) targets to identify any explosive ordnance within the site, followed by an Explosive Ordnance Disposal (EOD) operation, if required, to dispose of all positively identified EO. To deliver this project, Modus worked with subcontractors N-Sea and Ramora. The project utilised the DPII DSV Noordhoek Pathfinder, equipped with Modus CSROV, as well as N-Sea’s Aberlour to support diving operations. This series contains the survey deliverables for each target ID, including survey and inspection logs, video footage, target investigation reports and target images.
Categories
Geophysical
Development
Burbo Bank Extension
Industry
Wind
Phase
Pre-construction
Organisation
Modus
License
Marine Data Exchange Terms of Use

Data & downloads

Datasets